Wallboard Equipment

Explanation: The addition of all main and auxiliary materials is included in the automatic control system, which is automatically adjusted according to the speed of the production line to meet the requirements of large-scale and high speed.


Contact Now E-Mail Telephone WhatsApp
Product Details

After shaping the basic shape, use sandpaper to polish the edges of the ceiling and remove any edges or burrs. Be patient and careful when handling, otherwise it will greatly affect the aesthetics in the future.

After a few days of hard work, the suspended ceiling at home can be completed. As long as you grasp the key links in the above construction, you can ensure the aesthetics and safety of the gypsum board ceiling

Wallboard EquipmentWallboard Equipment

Production process of gypsum board

Ingredients:

Material preparation:

Modified starch, retarder, pulp, water reducer, and water are quantitatively measured and mixed into raw material slurry by a hydraulic pulp crusher, and then pumped into a slurry storage tank for backup;

Pour the foaming agent and water into the foaming agent preparation tank in proportion, stir evenly, and pump them into the foaming agent reserve tank (with a heating device, maintained at 35 ℃ or above) for backup;

The coagulant and gypsum powder raw materials are lifted and transported into the silo for backup by the lifting and conveying equipment;

Ingredients:

The slurry in the slurry reserve tank is pumped into the mixer using a metering pump, and the foaming agent is foamed using a dynamic foaming device before entering the mixer. The coagulant and gypsum powder are measured using a fully automatic measuring belt before entering the mixer. Then, all main and auxiliary materials are mixed into qualified stone paste slurry in the mixer.


Leave your messages

Related Products

Popular products

x

Submitted successfully

We will contact you as soon as possible

Close