Gypsum board from Plasterboard production line informationThere are various innovative materials on the market that enhance the aesthetics and functionality of buildings.Gypsum board from Plasterboard production line is a popular building material, mainly composed of non combustible cores made of gypsum. Gypsum board is a widely used building material in indoor structural design.Gypsum has various properties, so there are various gypsum products used in the construction industry.
Contact Now
There are gypsum boards from Plasterboard production line with different edges on the market, such as round edges, tapered edges, beveled edges, square edges, tongue edges, groove edges, etc.Gypsum board has various characteristics, so there is a huge demand in the construction fieldGypsum board from Plasterboard production line has good thermal performanceGypsum also has good thermal performance, so it provides a good balance between indoor humidity and temperature.
Contact Now
Gypsum board from Gypsum plasterboard production line is a commonly used building material in construction projects, such as suspended ceilings, suspended ceilings, false ceilings, partition walls, etc. It is covered on both sides with cardboard, and the center is made of gypsum material.
Contact Now
Plasterboard equipment Batching Technology, how to produce plasterboard.1. Plasterboard equipment Gypsum powder meteringGypsum powder is measured by belt weigher and German Schenck control system, with the control accuracy of 0.5%.2. Plasterboard equipment Dry powder additive meteringThe dry powder additive is measured by weight loss weighing method, and the measurement accuracy is less than 0.1%.3. Plasterboard equipment Liquid additive meteringGerman Netzsch pump is used for liquid additive measurement4.
Contact Now
Plasterboard machinery instruction1. Plasterboard machinery Batching part of production machinery: elevator, silo, metering scale, dynamic foaming station, gypsum powder conveying (frequency conversion), slurry conveying system (frequency conversion), slurry mixing tank and vertical mixer.
Contact Now
Fracture load: basically can reach the level of similar foreign products.Low yield: According to the national standard classification provisions, the first-grade product rate produced by 4 million square meters of gypsum board factory is generally below 90%, the pass rate is about 95%, and the production waste is large.Scale and output: domestic gypsum board production line is only a 4 million m2 scale, from the economic scale requirements, the current production line below 1000m2 unit product investment income is small, high unit consumption, product quality is unstable, compared with large-s
Contact Now
Gypsum board from Gypsum plasterboard production line installationBefore starting to install the gypsum board, please ensure that you have prepared the materials you will need and use:Screw• Pins• Washers• Drill• Metal profiles U and CTrimming knitT-shaped rulerAdhesive applicator• A tape measure• A pencilA hammer• Sound insulation tapeStep 1: Control the wallDetermine the location and safety of the composite wall. Mark the fixed line of the U-shaped profile with a pencil.
Contact Now
Raw materials: Due to the small scale of domestic production lines, raw gypsum is generally not homogenized directly into grinding and calcining.
Contact Now
As the Plasterboard manufacturing board strikes down a conveyer line, the calcium sulfate recrystallizes or rehydrates, reverting to its authentic rock state. The paper turns into chemically and automatically bonded to the core. The board is then reduce to size and conveyed thru dryers to get rid of any free moisture.End tapes are utilized that perceive manufacturer, facility, manufacturing line, date and time of manufacture as properly as u . s .
Contact Now
 Plaster grinding main equipment introductionPlaster powder is the bulk of Plaster for a series of treatment of the powder, the finished particle size is usually about 80-325 mesh, from the entire production process of Plaster grinding, the need to use the equipment mainly jaw crusher, Raymond mill and so on.Jaw crusher: also called jaw crusher, referred to as broken jaw. Mainly responsible for the rough crushing processing of Plaster. The working principle of extrusion crushing is adopted.
Contact Now
Water is delivered to the plaster of Paris combination to form a slurry of the terrific consistency. An asphalt emulsion and/or a wax emulsion is added to collect the preferred diploma of moisture resistance in the closing product. A foaming agent such as a detergent is included, and in the route of the mixing approach air is entrained into the material.
Contact Now
Detailed rationalization of Plaster grinding method flowStep 1: Large stones flip into small stonesThe giant Plaster uncooked substances want to be first overwhelmed by means of a jaw crusher till they can attain the feed fineness of the grinding machine.Step 2: Turn small stones into stone powderPlaster that meets the necessities for grinding fineness is despatched to the Plaster particle silo through a raise machine, and then continually and evenly
Contact Now
How to make plasterboard, and about the raw material is important element of drywall is the mineral gypsum. It is a light-density rock discovered in abundant deposits worldwide. Each molecule of gypsum (or dihydrous calcium sulfate) is composed of two mrolecules of water (H two 0) and one of calcium sulfate (CaSO four ). By weight the compound is 21% water, however via quantity it is almost 50% wate. Because the water current in gypsum is in crystalline form, the cloth is dry.
Contact Now
How to make plasterboard, and about the uncooked fabric is essential aspect of drywall is the mineral gypsum. It is a light-density rock observed in considerable deposits worldwide. Each molecule of gypsum (or dihydrous calcium sulfate) is composed of two mrolecules of water (H two 0) and one of calcium sulfate (CaSO 4 ).
Contact Now
Add foaming agent to the storage tank. When in use, the foaming agent and moisture are respectively sent to the foaming device by the metering pump, and compressed air is introduced to produce stable foam, which is sent to the vertical mixer.After the adhesive is prepared in the tank, it is fed into the spray ports on both sides of the forming station, and the adhesive tape is sprayed onto both sides of the paper gypsum board.
Contact Now
Analysis of main equipment of Plasterboard machineAdditive ListCalculate by thickness 12.5mm gypsum board7.6-8.3kg/㎡ Unit weight gypsum board:7.6-8.3kg/m2NoRaw   materialconsumption1gypsum   powder6.2-6.8kg/㎡2water4.5-5.0kg/㎡3paper0.35kg/㎡4starch25~40g/㎡5water   reducing agent15~45g/㎡6Retarder0~4g/㎡7accelerator0~35g/㎡8foaming   agent2~4g/㎡9white   latex2~4g/㎡Our company advantagesAs we all know, there are four fundamental factors that determine the quality of gypsum boardThe first is drying technology.With what kind of drying technology, the gypsum board can be dried m
Contact Now
Plaster grinding most important gear introductionPlaster powder is the bulk of Plaster for a sequence of remedy of the powder, the completed particle measurement is commonly about 80-325 mesh, from the complete manufacturing system of Plaster grinding, the want to use the tools typically jaw crusher, Raymond mill and so on.Jaw crusher: additionally referred to as jaw crusher, referred to as damaged jaw.
Contact Now
Water is brought to the plaster of Paris mixture to shape a slurry of the appropriate consistency. An asphalt emulsion and/or a wax emulsion is brought to acquire the favored degree of moisture resistance in the remaining product. A foaming agent such as a detergent is included, and in the course of the mixing technique air is entrained into the material.
Contact Now
Plasterboard equipment instruction1. Plasterboard equipment Batching section of manufacturing machinery: elevator, silo, metering scale, dynamic foaming station, gypsum powder conveying (frequency conversion), slurry conveying machine (frequency conversion), slurry mixing tank and vertical mixer.
Contact Now
Add foaming agent to the storage tank. When in use, the foaming agent and moisture are respectively despatched to the foaming machine via the metering pump, and compressed air is delivered to produce secure foam, which is despatched to the vertical mixer.After the adhesive is organized in the tank, it is fed into the spray ports on each aspects of the forming station, and the adhesive tape is sprayed onto each facets of the paper gypsum board.
Contact Now
Plasterboard machinery Drying system: including dryer, transmission system, heat exchanger, fan circulation system, dehumidification system and other equipment. During the process of gypsum board walking in the drying kiln, the internal water is evenly removed to keep the water content of gypsum board finished products in the range of 2% - 3%.
Contact Now
Detailed clarification of Plaster grinding system flowStep 1: Large stones flip into small stonesThe giant Plaster uncooked substances want to be first overwhelmed with the aid of a jaw crusher till they can attain the feed fineness of the grinding machine.Step 2: Turn small stones into stone powderPlaster that meets the necessities for grinding fineness is despatched to the Plaster particle silo by using a carry machine, and then always and evenly fe
Contact Now
In its pure form, gypsum is white, however impurities regularly provide it hues like gray, brown, pink, or black. Gypsum that has been overwhelmed and heated to put off 75% of its water content material is regarded as plaster of Paris.
Contact Now
Plasterboard equipment Drying system: along with dryer, transmission system, warmth exchanger, fan circulation system, dehumidification machine and different equipment. During the procedure of gypsum board on foot in the drying kiln, the inside water is evenly eliminated to preserve the water content material of gypsum board completed merchandise in the vary of 2% - 3%.
Contact Now
Relate News
Recently, the second gypsum production line of Guizhou Yongdingshun Gypsum Building Materials Co., Ltd., a key investment attraction project of Guizhou Jinyuan Qianxi Power Plant, has been completed and put into operation. The production line will consume 240000 tons of gypsum and 120000 tons of steam from Qianxi Power Plant annually.It is reported that Guizhou Yongdingshun Gypsum Building Materials Co., Ltd. is a key investment attraction enterprise of Qianxi Power Plant.
Our company undertaken the project for 15 million m2 gypsum board production line in Tanzania and completed the 72 hour production acceptance.On the path of firmly promoting global layout, BNBM focuses on epidemic prevention and control while also focusing on business development. The production and sales of the North New Base in Tanzania are thriving. Despite the severe pandemic and a two-month shutdown, it has achieved full production and full sales, with a gross profit margin of 27%.
Exhibition time: November 7th - November 10th, 2023Exhibition location: Yidu Citizen Activity Center Exhibition CenterSponsored by: Hubei Yihua Group Co., Ltd., Yidu Municipal People's Government, Gypsum Building Materials Branch, China Building Materials Federation, Institute of Building Materials Industry Technical Information ResearchMeeting synchronization:Expert Q&A Meeting on Difficult Issues in Gypsum Production and ApplicationThe 4th Symposium on Comprehensive Utilization of PhosphogypsumThe 7th National Technical Exchange Conference on Gypsum Mortar IndustryTechnical Exchange
On March 15th, the annual production of 450000 tons of calcined gypsum powder project by Hubei Shengfeng Environmental Protection Technology Co., Ltd. began construction in Yujiahu Industrial Park, Baokang Economic Development Zone.It is understood that the project is planned to be constructed in two phases. The first phase will have an annual output of 450000 tons of calcined gypsum powder, accompanied by a production line for harmless treatment of 600000 tons of phosphogypsum per year.
Georgia-Pacific held a ribbon cutting recently for their  new $325 million gypsum wallboard production expansion facility.The event was invitation only and included remarks by Georgia-Pacific president of the gypsum business, David Neal, Georgia-Pacific executive vice president of building products, Andy Konieczka and Nolan County Judge Whitley MayDECA Students from Sweetwater High School were also invited to attend the Georgia -Pacific ribbon cutting event.  DECA prepares emerging leaders and entrepreneurs for careers in marketing finance, hospitality and management in hig
On the basis of achieving "investment in the same year, profit in the same year" in the Tanzania production line of Beixin Building Materials, the construction of a new line with an annual output of 15 million square meters of paper faced gypsum board will be completed in 2021 and officially put into operation in 2022.
The high-end gypsum board production project of Beixin Building Materials (Hezhou) Co., Ltd. has a total investment of 277 million yuan, covering an area of 148.9 acres, a building area of 40300 square meters, and an annual production of 30 million square meters of paper gypsum board and 10000 tons of light steel keel production line project has been completed in the factory area. The expected annual output value is 300 million yuan.
 Canadian building materials manufacturer is set to restore and reopen a gypsum quarry in Cape Breton.Canadian Gypsum Company Inc.
French materials producer Saint-Gobain has begun production of zero-carbon plasterboard at its modernised plant in Fredrikstad, southeast Norway.The company says its decarbonisation of the manufacturing process was made possible by switching from natural gas to hydroelectric power, thus avoiding 23,000 tons of carbon dioxide emissions a year.Energy is also saved by improved heat recovery and a more efficient manufacturing process, which has reduced energy use at the site by 30% and increased capacity 40%.According to Saint-Gobain, this will enable it to launch a full range of plasterboard prod
PALATKA, Fla.--(BUSINESS WIRE)--Saint-Gobain North America, through its building products subsidiary CertainTeed Interior Products Group, today announced plans to invest $235 million over the next two years to expand its CertainTeed gypsum manufacturing facility in Palatka, Florida, more than doubling the production capacity of the existing manufacturing plant and creating over 100 new, permanent jobs.The expansion of manufacturing and warehouse space in Palatka, which is strategically located near the Port of Jacksonville, comes as Saint-Gobain continues to implement its global Grow and Impac
x

Submitted successfully

We will contact you as soon as possible

Close